Home >

Sichuan Jiayueda Building Materials Co., Ltd. Company Profile

Factory Tour
Production Line

The factory is mainly divided into three parts: production area, office area and storage area. The production area has multiple production lines dedicated to the manufacture of various products. Each production line is equipped with advanced equipment to improve production efficiency and quality. The office area is located on one side of the production area, including administrative offices, meeting rooms and employee rest areas. The storage area is located on the other side of the factory and is used to store raw materials and finished products.

The factory has complete internal facilities, equipped with advanced production equipment and logistics system. The floor of the production area is laid with an anti-static floor, which provides a good environment for production operations. At the same time, the factory has also installed an automatic temperature control system and fire-fighting equipment to ensure the safety and stability of the production process.

Production capacity:
Daily output: 400,000-500,000 meters
Monthly production: 10-15 million meters
General lead time:
20 to 30 days.
Fastest delivery time:
We can speed up production arrangements according to customer needs. We used to take 30 days from the order to the delivery and loading as soon as possible. Completely delivered a 40-foot high-standard container.

 

Sichuan Jiayueda Building Materials Co., Ltd. factory production line 0

 

Sichuan Jiayueda Building Materials Co., Ltd. factory production line 1

Send your inquiry directly to us

Privacy Policy China Good Quality Foam Weather Stripping Supplier. Copyright © 2023-2024 weather-strippings.com . All Rights Reserved.